This post is part of a series. The idea is to take these quieter months to take some positive action and look after yourself. The form it can take varies from person to person – my plan is:


You can find all posts here.
1/3 – Saturday
Went out for a little excursion with Mr Team Sikel. Got some tacos and refills, and picked up a vintage trouser fitting book I’m chuffed to bits to have gotten for 50p.
In the evening I made a little progress on my jumper. I’m still not happy with now that first N looks, and will have a play with fixing it before I do the diagonal line on the second.

I did my physio
2/3 – Sunday
Half hour yoga session this morning, hooray!
I fixed the N – added a little bit to make the diagonal line end closer to the top and bottom of the vertical ones, I think it looks a lot better. I’m going to try to start there in the first place, and maybe take a little off the inner corners of those diagonal lines for the amount I’ve had to add to the outer corners, if that makes sense?

I also don’t have pictures, but I planted out the pups from last week’s plant tidying – hopefully they’ll be happy in their new homes.
Did my physio
3/3 – Monday
I finished off the other N. I don’t have a photo of it, but the skinnier line didn’t look right with the rest of the lettering, so I just matched what I’d done on the other.

I’ve got loads of ends to weave in, which I’ll do before tackling the last letter. I’ll still have the upper chain to make, but at least I’ll have finished the letters!
I did my physio.
4/3 – Tuesday
My first pottery class at its proper time. I was a bit sad to have not made a slab built bowl, but I’m happy with how my beaker/potion bottle vase is turning out.




We also had a go making pinch pots – I’m not especially happy with mine, but I’ll use it for mark-making practice before putting it in reclaim.

When I got home I felt compelled to do some ladder repairs with the day’s Mend March prompt, so I tackled a few mends on a basic uniqlo shirt.


I realised afterwards I’d missed one, so I have a little more work to finish it off. Very pleased with the variegated thread.
I did my physio.
5/3 – Wednesday
Half hour yoga session
Tackled the last darn on my shirt – can you find it?

I also did a bit of work on the donated jumper at repair cafe, plus mending a jacket for Jeremy Fisher. No photos though.
I did my physio.
6/3 – Thursday
I weaved in my million ends on the back of the upper row of letters.



I did my physio.
7/3 – Friday
A 20-minute yoga session today.
I picked up my shoes from the cobbler


Very pleased with how they’ve turned out, though he commented again how poor it was the stitching had given out – apparently there was another area that was coming away he stuck back down for me while doing this. Lovely man! I’m sorry my shoes aren’t up to his standards 😂, but now that I own them I’m going to wear them as long as I can.
No photos, but I did a bit of work on the label for my other lily pad blanket from Week 4. The recipient arrived a bit early, so I didn’t have it ready. Despite saying it wasn’t a rush to finish, Mr Team Sikel has asked me about 4 times in the past 3 days if I’d post it, so I should probably finish it up.
I also, of course, managed to give myself another project – though I won’t add it to my list. A charity shop I frequent has started selling some damaged clothes at a discount!

Pleased to pick up a couple jumpers here, plus another at a different charity shop that had a bunch of whip stitch repairs that I’ll replace with something more fun. I enjoy having some practice, but they’ll each need a week of freezer quarantine to prevent moth issues.
I did my physio.
Reflection
I’m going to remove things I definitely won’t get done by the end of this season so I don’t feel so daunted. This post is late before my website had run out of space – too many photos! So I spent a little time deleting old product photos that had sold, plus resizing some old blog post photos to make more space. Can that count as my tidying for the week?
Projects still to finish:
- Embellished Jumper
- Donated Jumper Repair